| · Portal |
Help
Search
Members
Calendar
|
| Welcome Guest ( Log In | Register ) | Resend Validation Email |
![]() ![]() ![]() |
| kieran |
Posted: Sep 19 2007, 06:41 PM
|
|
Member Group: Admin Posts: 22 Member No.: 2 Joined: 8-June 07 |
As at 19 Sep 07:
Job # Log date Location Priority Description Update 1 Sep-07 GLADE G25/G29 LOW PRIORITY Glade area (around paths G26 & G29)- brambles have grown into glade area. Needs to be cut back 2 Sep-07 Steps H21 HIGH PRIORITY -steps up from Bostall lane (H21). Severely eroded away. Needs rebuilding 3 Sep-07 Path H13 HIGH PRIORITY -access path from Rochdale road (H13). Severely 'rutted' and generally very difficult to walk on even for fitter walkers. Needs clearing back, flattened and perhapas a hard wearing surface installed. 4 Sep-07 Path G40 LOW PRIORITY -path upto cemetery ( _G40) - brambles have grown into path. Needs cutting back 5 Sep-07 Path G14 LOW PRIORITY =- path near Glade area (G14) between main paths G19 & G15. Seviously overgrown. Needs cutting back. 6 Sep-07 Path H5 LOW PRIORITY overgrown. Needs clearing. 7 Sep-07 Path W12 MEDIUM PRIORITY Green chain walk main path from top of woods to bottom. Severely rutted and difficult to walk on. 8 Sep-07 path p10 MEDIUM PRIORITY path eroded away. On Bostall walk and therefore required for wheel chair route. 9 Sep-07 Orienteering course LOW PRIORITY course eroded and end of life. Needs replacing Kieran has arranged Council to provide posts and recruited localexplorer scouts to insytall new course. 17sep: 18 new posts installed in south woods 10 Sep-07 Various positions LOW PRIORITY New benches are required all over woods. KMD has contacted Jeremy Shearmur who has placed an order for 3 more meatl ones around the firld by the yard. |
![]() |
![]() ![]() ![]() |